Calgary Transit Service Alerts
Alerts as of Sep 11, 2026, 3:19 AM MT — updated every 10 minutes.
Stop moved
Affected routes: Route 5
Affected stops: stop 5941
Active Jan 1, 2026, 6:00 AM MT until Dec 31, 2026, 3:00 PM MT.
Starting Sunday, June 1 through Thursday, December 31, 2026, the right lane of northbound Edmonton Trail N.E. @ 1 Street N.E. will be closed for construction. Route 5 will have stop closures.
Daily closures will occur between 9 a.m. and 3 p.m..
The following stops will be temporarily closed:
- NB Edmonton TR @ 1 AV NE (#5941)
Please use the following stops in lieu of the closed stops:
- NB Edmonton TR @ 1 AV NE (#5941) - 71m north of closed stop
Stop moved
Affected routes: Route 42, Route 68
Affected stops: stop 6175
Active Sep 1, 2026, 6:00 AM MT until Sep 13, 2026, 3:00 PM MT.
Starting Tuesday, September 1, from 9 a.m. to 3 p.m. daily, the northbound right-hand lane on 68 Street N.E. between Abbotsford Drive N.E. and Abbeydale Drive N.E. will be closed for construction. Routes 42 and 68 will have a stop closure.
The following stop will be temporarily closed:
- NB 68 ST N.E. @ Abbeydale DR N.E. (#6175) - Routes 42 and 68
Please use the following stop in lieu of the closed stop:
- NB 68 ST N.E. @ Abbeydale DR N.E. - nearside temporary stop (180m south of the closed stop)*
*Please note: temporary stop is not universally accessible.
Stop moved
Affected routes: Route 49
Affected stops: stop 4369, stop 6170
Active Aug 4, 2026, 1:00 PM MT until Sep 21, 2026, 3:00 PM MT.
Starting at 2 p.m. on Tuesday, August 4, and continuing until 5 p.m. on Monday, September 21, westbound Memorial Drive E. will have closures between 68 Street N.E. - Abbeydale Drive N.E., and southbound Abbeydale Drive N.E. will have closures between Abberfield Way - Abbercover Way S.E. Route 49 will have stop closures.
The following stops will be temporarily closed:
- EB Memorial DR @ 68 ST SE (#6170)
- NB Abbeydale DR @ Memorial DR E (#4369)
Please use the following temporary stops in lieu of the closed stop:
- EB Memorial DR @ 68 ST SE (100m west of 68 Street S.E.)
- NB Abbeydale DR NE @ Abalone CR NE (far side)
Stop moved
Affected routes: Route 42, Route 67
Affected stops: stop 4361
Active Aug 4, 2026, 1:00 PM MT until Sep 21, 2026, 3:00 PM MT.
Starting at 2 p.m. on Tuesday, August 4, and continuing until 5 p.m. on Monday, September 21, westbound Memorial Drive E. will have closures between 68 Street N.E. - Abbeydale Drive N.E., and southbound Abbeydale Drive N.E. will have closures between Abberfield Way - Abbercover Way S.E. Routes 42 & 67 will have a stop closure.
The following stop will be temporarily closed:
- WB Memorial DR @ Abbeydale DR NE(#4361)
Please use the following stops in lieu of the closed stop:
- SB Abbeydale DR NE @ Abbeyfield WY NE (near side, temporary stop)
- WB Memorial DR @ 68 ST SE (#4362)
Stop moved
Affected routes: Route 119, Route 157
Affected stops: stop 2291
Active Jun 22, 2026, 9:00 AM MT until Sep 24, 2026, 3:00 PM MT.
Starting Monday, June 22 at 9 a.m. through Thursday, September 24 at 3 p.m., westbound lane closures will be in effect on Country Hills Boulevard, east of 36 Street N.E. will be closed for road construction. Routes 119 and 157 will be affected.
The following stop will be temporarily closed:
- WB Country Hills BV @ E. of Barlow TR NE (#2291) - Routes 119 & 157
A temporary stop will be placed 65m west of the closed stop.
Stop moved
Affected routes: Route 40
Affected stops: stop 6796
Active May 13, 2026, 8:00 AM MT until Oct 2, 2026, 7:00 PM MT.
Starting on at 9 a.m. on Wednesday, May 13, and continuing until 7 p.m. on Friday, October 2, eastbound 16 Avenue N.W. will be closed between Monterey Avenue N.W. and Montgomery Avenue N.W. to accommodate feeder main work. A temporary stop already in place for Route 40 will be affected.
The following stop & temporary stop will be temporarily closed:
- SB 16 AV NW @ Monterey AV (#6796)
- Temporary stop located one block west of closed stop #6796
Please use the following stop in lieu of the closed temporary stop:
- SB 16 AV NW @ 43 ST NW (#6492)
Stop moved
Affected routes: Route 24
Affected stops: stop 2480
Active Jul 20, 2026, 8:00 AM MT until Oct 31, 2026, 3:00 PM MT.
Starting on Monday, July 20, and continuing daily from 9 a.m. - 3 p.m. until Saturday, October 31, the southbound lane on 18 Street S.E. south of Riverview Circle S.E. will be closed to accommodate construction. Route 24 will have a stop closure.
The following stop will be temporarily closed:
- SB 18 ST @ Riverview CI SE (#2480)
Please use the following stop in lieu of the closed stop:
- SB 18 ST @ Riverview CI SE (140m north of the closed stop)
Stop moved
Affected routes: Route 1, Route 101, Route 17, Route 3
Affected stops: stop 6334
Active Jul 10, 2026, 4:00 PM MT until Dec 31, 2026, 11:59 PM MT.
Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 1, 3, 17 & 101 will have a stop closure.
The following stop will be temporarily closed:
- WB 6 AV SW @ E. of 1 ST SW (#6334)
Please use one of the following stops in lieu of the closed stop:
- Route 1:
- WB 6 AV SW @ 2 ST SW (#5178)
- WB 6 AV SE @ 1 ST SE (#2234)
- Route 3:
- WB 6 AV SW @ 2 ST SW (#5178)
- SB Centre ST S @ 4 AV S (#6669)
- Route 17:
- SB Centre ST S @ 4 AV S (#6669)
- WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
- Route 101:
- WB 6 AV SE @ 1 ST SE (#7466)
- WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
Stop moved
Affected routes: Route 2, Route 4
Affected stops: stop 5115
Active Jul 10, 2026, 4:00 PM MT until Dec 31, 2026, 11:59 PM MT.
Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 2 & 4 will have a stop closure.
The following stop will be temporarily closed:
- WB 6 AV SW @ 1 ST SW (#5115)
Please use one of the following stops in lieu of the closed stop:
- Route 2:
- SB Centre ST S @ 4 AV S (#6669)
- WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
- Route 4:
- WB 6 AV SE @ 1 ST SE (#7466)
- WB 6 AV SW @ 2 ST SW (#5118 - temporary, near side stop)
Stop moved
Affected routes: Route 135, Route 43, Route 87
Affected stops: stop 8118
Active Sep 3, 2026, 6:00 AM MT until Sep 14, 2026, 3:00 PM MT.
Starting Thursday, September 3 from 9 a.m. through Monday, September 14 at 3 p.m., there will be a right lane closure on northbound 36 Street S.E. between 12 Avenue - 17 Avenue S.E. for construction. Routes 43, 87 and 135 will have a stop closure.
The following stop will be temporarily closed:
- NB 36 ST S.E. @ 17 AV S.E. (#8118) - Routes 43, 87 & 135
Please use the following stop in lieu of the closed stop:
- NB 36 ST S.E. @ 16 AV S.E. - near side
Stop moved
Affected routes: Route 117, Route 131, Route 151
Affected stops: stop 9983
Active Jul 10, 2026, 4:00 PM MT until Dec 31, 2026, 11:59 PM MT.
Starting at 4 a.m. on Monday, July 13, and continuing until end of service on Wednesday, December 31, the right lane on 6 Avenue S.W. between 1 Street S.W. & Centre Street S. will be closed to accommodate construction at Suncor Energy Centre. Routes 117, 131 & 151 will have a stop closure.
The following stop will be temporarily closed:
- WB 6 AV SW @ E. of 1 ST SW (#9983)
Please use the following temporary stop in lieu of the closed stop:
- WB 6 AV SW @ 70m W. of 1 ST SW
Stop moved
Affected routes: Route 13, Route 15, Route 24, Route 6, Route 7, Route 90
Affected stops: stop 7315, stop 7840
Active May 25, 2026, 6:00 AM MT until Oct 23, 2026, 11:59 PM MT.
Starting Monday, May 25 and continuing until further notice, due to a road closure on the corner of 1 Street S.W. @ 10 Avenue, routes 6, 7, 13, 15, 24 and 90 will have stop closures.
The following stops will be temporarily closed:
- NB 1 ST S.W. @ 10 AV S.W. (#7315) - nearside - Routes 6, 24 & 90
- SB 1 ST S.W. @ 10 AV S.W. (#7840) - Routes 7, 13, 15 & 90
Please use the following stop in lieu of the closed stops:
- SB 1 ST S.W. @ 10 AV S.W. - 100m south of closed stop - Routes 7, 13, 15 & 90
Stop moved
Affected routes: Route 119, Route 157
Active Jul 22, 2026, 9:00 AM MT until Sep 24, 2026, 3:00 PM MT.
Starting Wednesday, July 22 at 9 a.m. through Thursday, September 24 at 3 p.m., Routes 119 and 157 will have a stop closure.
The following stop will be temporarily closed:
- WB Country Hills BV @ E. of Barlow TR NE (#2291) - Routes 119 & 157
A temporary stop will be placed just 65m west of the closed stop (farside of driveway access).
Stop moved
Affected routes: Route 13, Route 2, Route 7
Affected stops: stop 5143
Active Aug 20, 2026, 6:00 AM MT until Sep 14, 2026, 5:00 AM MT.
Starting Thursday, August 20 at 7 a.m., and continuing until 5 a.m. on Monday September 14, southbound 8 Street S.W. will be closed from 10 - 11 Avenue S.W. Routes 2, 7 & 13 will have a stop closure.
The following stop will be temporarily closed:
- NB 8 ST SW @ 11 AV SW (#5143)
Please use the following temporary stop in lieu of the closed stop:
- NB 8 ST SW @ 12 AV SW (far side)
Stop moved
Affected routes: Route 10
Active Aug 24, 2026, 8:00 AM MT until Sep 13, 2026, 7:00 PM MT.
Starting on Monday, August 24, and continuing weekdays from 9 a.m. - 3 p.m., and weekends from 7 a.m. - 7 p.m. until Sunday, September 13, northbound Fairmount Drive S.E. will have lane closures at Franklin Drive S.E. Route 10 will have a stop closure.
The following stop will be temporarily closed:
- NB Fairmount DR @ Franklin DR SE (#4813)
Please use the following temporary stop in lieu of the closed stop:
- NB Fairmount DR @ Franklin DR SE (far side, 30m from the closed stop)
Stop moved
Affected routes: Route 111, Route 26
Affected stops: stop 6501
Active Sep 4, 2026, 6:00 AM MT until Sep 17, 2026, 3:00 PM MT.
Starting Friday, September 4 from 9 a.m. through Thursday, September 17 at 3 p.m., there will be an eastbound right lane closure on the Bow Trail S.W. between Rossmere Road S.W. to Rosscarrock Gate S.W. for construction. Routes 26 and 111 will have a stop closure.
The following stop will be temporarily closed:
- EB Bow TR @ Rossmere RD S.W. (#6501) - Route 26 and 111
Please use the following stop in lieu of the closed stop:
- EB Bow TR @ Rosscarrock GA S.W. - far side
Detour
Affected routes: Route 414
Active Apr 22, 2026, 6:00 AM MT until Dec 31, 2026, 11:59 PM MT.
Starting Wednesday, April 22 through Thursday, December 31, westbound 19 Avenue and 14 Street S.W. will be closed due to construction. Route 414 will be detoured.
Route 414 will travel:
- From south on 14 Street
- West on 21 Avenue
- North on 15 Street, to regular route
No stops are affected.
Stop moved
Affected routes: Route 22, Route 66
Affected stops: stop 8426
Active Sep 8, 2026, 4:00 AM MT until Sep 23, 2026, 3:00 PM MT.
Starting on Tuesday, September 8 at 5 a.m., and continuing until Wednesday, September 23 at 3 p.m., westbound 6 Avenue S.W. will have lane closures from 9-10 Street S.W. Routes 22 & 66 will have a stop closure.
The following stop will be temporarily closed:
- WB 6 AV SW @ 9 ST SW far side (#8426)
Please use the following temporary stop in lieu of the closed stop:
- WB 6 AV SW @ 10 ST SW (#9078)
Stop moved
Affected routes: Route 149, Route 15, Route 43, Route MT
Affected stops: stop 2487
Active Sep 5, 2026, 7:00 AM MT until Oct 3, 2026, 7:00 PM MT.
Starting Saturday, September 5 through Saturday, October 3, from 9 a.m. to 3 p.m. on weekdays and 7 a.m. to 7 p.m. on weekends, there will be right lane closure on the Heritage Drive S.E. @ Heritage Meadows Way S.E. for concrete work. Routes 15, 43, 149 and MAX Teal will have stop closures.
The following stop will be temporarily closed:
- Deerfoot Meadows Station (EB) (#2487) - Route 15, 43, 149 and MAX Teal
Please use the following stops in lieu of the closed stops:
- EB Heritage DR S.E. @ 11 ST S.E. - 130m east from closed stop - Route 15, 149 and MAX Teal
- WB Heritage Meadows WY @ 11 ST S.E. (#2517) - Route 43
Stop moved
Affected routes: Route 109, Route 116, Route 117, Route 131, Route 142, Route 151, Route 62, Route 64
Affected stops: stop 2377
Active Sep 8, 2026, 4:00 AM MT until Sep 23, 2026, 3:00 PM MT.
Starting on Tuesday, September 8 at 5 a.m., and continuing until Wednesday, September 23 at 3 p.m., westbound 6 Avenue S.W. will have lane closures from 9-10 Street S.W. Routes 62, 64, 109, 116, 117, 131, 142 & 151 will have a stop closure.
The following stop will be temporarily closed:
- WB 6 AV SW @ 9 ST SW (#2377)
Please use the following temporary stop in lieu of the closed stop:
- WB 6 AV SW @ 10 ST SW (#9078)
Stop moved
Affected routes: Route 10
Active Aug 25, 2026, 8:00 AM MT until Sep 12, 2026, 3:00 PM MT.
Starting on Tuesday, August 25, and continuing daily from 9 a.m. - 3 p.m. until Saturday, September 12, 50 Avenue S.W. will have lane closures around Macleod Trail. Route 10 will have stop closures.
The following stops will be temporarily closed:
- NB Macleod @ 50 AV SW (#5555)
- SB Macleod @ 50 AV SW (#5524)
Please use the following temporary stops in lieu of the closed stops:
- NB Macleod @ 50 AV SW (far side, 50m further from the intersection)
- SB Macleod @ 50 AV SW (far side)
Detour
Affected routes: Route 15, Route 17, Route 3
Affected stops: stop 5217, stop 5594
Active Aug 29, 2026, 7:00 AM MT until Oct 19, 2026, 3:00 PM MT.
Starting Saturday, August 29 through Monday, October 19, from 9 a.m. to 3 p.m. on weekdays and 7 a.m. to 7 p.m. on weekends, eastbound 25 Avenue @ 4 Street S.W. will be closed for construction. Route 17 will be detoured. Routes 3 and 15 will have a stop closure.
Outbound route 17 will travel:
- From South on 4 Street S.W.
- East on 26 Avenue S.W.
- North on 2 Street S.W.
- East on 25 Avenue S.W., to regular route
The following stops will be temporarily closed:
- NB 4 ST S.W.@ 25 AV S.W. fs - (#5217) Routes 3, 15 & 17
- EB 25 AV S.W. @ 4 ST S.W. - (#5594) - Route 17
Please use the following stops in lieu of the closed stops:
- NB 4 ST S.W. @ 24 AV S.W. - near side detour stop
- EB 26 AV S.W. @ 4 ST S.W. - far side detour stop - Route 17
Detour
Affected routes: Route 54
Active Sep 3, 2026, 6:00 AM MT until Oct 1, 2026, 2:00 AM MT.
Effective immediately, and continuing until September 30, Route 54 will be detoured.
Buses will travel:
- From west on Hamptons Drive N.W.
- North on Hamptons Way N.W.
- West on Hamptons Close N.W.
- Use Hamptons Close N.W. to turn around, going north on Hamptons Close N.W.
- East on Hamptons Way N.W.
- East on Hamptons Drive N.W.
- West on Country Hills Boulevard N.W.
- North on Hamptons Boulevard N.W., to regular route
Stop moved
Affected routes: Route 56, Route 776
Affected stops: stop 4237, stop 4238, stop 4239, stop 4240, stop 6429, stop 6430
Active Sep 2, 2026, 6:00 AM MT until Sep 16, 2026, 11:00 PM MT.
Starting Wednesday, September 2 through Wednesday, September 16, from 8 a.m. to 11 p.m. daily, there will be closures on eastbound 90 Avenue S.W. between 24 Street & 14 Street S.W. for concrete work. Routes 56 and 776 will have stop closures.
The following stops will be temporarily closed:
- EB 90 AV S.W. @ 24 ST S.W. (#6429)
- EB 90 AV S.W. @ Bay View DR (#4239)
- EB 90 AV S.W. @ Bay Ridge DR (#4238)
- EB 90 AV S.W. @ 19 ST S.W. (#4240)
- EB 90 AV S.W. @ W. of 16 ST S.W. (#4237)
- EB 90 AV S.W. @ 16 ST S.W. (#6430)
Temporary stops will be in place 25m east of each of the closed stops.
Stop moved
Affected routes: Route 5
Active Sep 10, 2026, 8:00 AM MT until Sep 11, 2026, 3:00 PM MT.
Starting on Thursday, September 10, and continuing daily from 9 a.m. - 3 p.m. until Friday, September 11, eastbound 5 Avenue S.W. will have a lane closure at 3 Street S.W. Route 5 will have a stop closure.
The following stop will be temporarily closed:
- EB 5 AV SW @ 3 ST SW (#8645)
Please use the following stop in lieu of the closed stop:
- EB 5 AV SW @ 2 ST SW (#9957)
Detour
Affected routes: Route 101
Affected stops: stop 2903, stop 5056, stop 5610, stop 7251
Active Feb 9, 2026, 6:00 AM MT until Nov 15, 2026, 9:00 AM MT.
Starting Monday, February 9 at 9 a.m. through Sunday, November 15 at 9 a.m., 6 Street S.E. @ 9 Avenue S.E. will be closed for 6 Street S.E. underpass construction. Route 101 will be detoured.
Westbound route 101 will travel:
- From West on 9 Avenue S.E.
- North on 4 Street S.E.
- West on 6 Avenue S.E., to regular route
Eastbound route 101 will travel:
- From East on 6 Avenue S.E.
- South on 4 Street S.E.
- East on 9 Avenue S.E., to regular route
The following stops will be temporarily closed:
- NB 6 ST S.E. @ 8 AV S.E. (#7251)
- WB 6 AV S.E. @ 5 ST S.E. (#5610)
- EB 6 AV S.E. @ 5 ST S.E. (#2903)
- SB 6 ST S.E. @ 8 AV S.E. (#5056)
Please use the following stops in lieu of the closed stops:
- WB 9 AV S.E. @ 5 ST S.E. - detour stop
- WB 6 AV S.E. @ 4 ST S.E. (#5112)
- EB 6 AV S.E. @ 3 ST S.E. (#2902)
- EB 9 AV S.E. @ Olympic WY S.E. - detour stop
Stop moved
Affected routes: Route 1, Route 101, Route 131, Route 151, Route 302, Route MP
Active Feb 9, 2026, 6:00 AM MT until Nov 15, 2026, 9:00 AM MT.
Starting Monday, February 9 at 9 a.m. through Sunday, November 15 at 9 a.m., there will be lane closures on 9 Avenue S.E. between 5 Street and 6 Street S.E. for 6 ST S.E. underpass construction. Routes 1, 101, 131, 151, 302 and MAX Purple will have stop closures.
The following stops will be temporarily closed:
- WB 9 AV S.E. @ The Confluence (#5079) - Routes 1 and 101
- WB 9 AV S.E. @ The Confluence (#9821) - Routes 302 and MAX Purple
- WB 9 AV S.E. @ 6 ST S.E. (#3389) - Routes 1 and 131
- EB 9 AV S.E. @ 6 ST S.E. (#3886) - Routes 1, 131, 302 and MAX Purple
- EB 9 AV S.E. @ 6 ST S.E. (#3917) - Route 151
Please use the following stops in lieu of the closed stops:
- WB 9 AV S.E. @ 100m east of closed Stop #5079 - Routes 1 and 101
- WB 9 AV S.E. @ 100m east of closed Stop #9821 - Routes 302 and MAX Purple
- WB 9 AV S.E. @ 5 ST S.E. - Routes 1 and 131
- EB 9 AV S.E. @ Olympic WY S.E. - Routes 1, 131, 151, 302 and MAX Purple
Service alert
Affected routes: Route 201
Active Sep 8, 2026, 1:00 PM MT until Sep 14, 2026, 3:00 AM MT.
Sept 12-13: Chinook to Erlton/Stampede closure
The Red Line will be closed between Chinook and Erlton/Stampede stations starting on Saturday, September 12, until the early hours of Monday, September 14.
Red Line trains coming from the north and downtown will terminate at Erlton/Stampede Station, and trains coming up from the south will terminate at Chinook Station. Shuttle buses will replace train service between these stations.
For more information, please visit calgarytransit.com/ctrain-service
Stop moved
Affected routes: Route 22, Route 66
Affected stops: stop 6675
Active Sep 10, 2026, 8:00 AM MT until Sep 11, 2026, 3:00 PM MT.
Starting at 9 a.m. on Thursday, September 10, and continuing until 3 p.m. on Friday, September 11, 33 Avenue S.W. will have a lane closure in both directions at Sarcee Road S.W. Routes 22 & 66 will have a stop closure.
The following stop will be temporarily closed:
- EB 33 AV SW @ 29 ST SW (#6675)
Please use the following temporary stops in lieu of the closed stop:
- Route 22:
- EB 32 AV SW @ Sarcee RD SW (near side)
- Route 66:
- NB Sarcee RD SW @ 33 AV SW (near side)
Stop moved
Affected routes: Route 150
Affected stops: stop 4979, stop 9379
Active Sep 9, 2026, 6:00 AM MT until Sep 11, 2026, 7:00 PM MT.
Starting at 7 a.m. on Wednesday, September 9, and continuing until 7 p.m. on Friday, September 11, eastbound 114 Avenue S.E. will have a lane closure at 29 Street S.E. Route 150 will have stop closures.
The following stops will be temporarily closed:
- EB 114 AV SE / 29 ST SE (#9379)
- SB 114 AV SE @ 29 ST SE (#4979)
Please use the following temporary stop in lieu of the closed stops:
- EB 114 AV SE / 29 ST SE (far side)
Stop moved
Affected routes: Route 56, Route 776
Affected stops: stop 4230, stop 4231, stop 6432, stop 6433
Active Sep 9, 2026, 9:00 AM MT until Sep 19, 2026, 3:00 PM MT.
Starting Wednesday, September 9 at 9 a.m. through Saturday, September 19 at 3 p.m., westbound 90 Avenue between Oakmount Drive - 24 Street S.W. will be closed for paving work. Routes 56 & 776 will be affected.
The following stops will be temporarily closed:
- WB 90 AV SW @ Bayview DR - #6432 - Routes 56 & 776
- WB 90 AV SW @ 24 ST SW - #6433 - Route 776
- WB 90 AV SW @ 24 ST SW - #4231 - Route 776
- WB 90 AV SW @ Oakside GA - #4230 - Route 776
Please use the following stops:
- WB 90 AV SW @ Bayview DR - near side Temporary Stop - Routes 56 & 776
- SB Palliser DR @ 90 AV SW - #6434 - Route 776
Detour
Affected routes: Route 404, Route 697, Route 832
Active Sep 8, 2026, 6:00 AM MT until Sep 12, 2026, 7:00 PM MT.
Starting Tuesday, September 8 at 7 a.m. through Saturday, September 12 at 7 p.m., there will a road closure on 19 Street @ 2 Avenue N.W. for construction work. Routes 404, 697 and 832 will be detoured.
Route 404 will travel:
- From East on Kensington Road
- North on 19 Street N.W.
- West on 1 Avenue N.W.
- North on 20 Street N.W.
- East on 4 Avenue N.W.
- North on 19 Street N.W., to regular route
Route 697 in the morning will travel:
- From South on 19 Street N.W.
- East on 3 Avenue N.W.
- South on 20 Street N.W.
- West on Kensington Road, to regular route
Route 697 in the afternoon will travel:
- From East on 1 Avenue N.W.
- North on 20 Street N.W.
- East on 4 Avenue N.W.
- North on 19 Street N.W., to regular route
Route 832 in the afternoon will travel:
- From East on 1 Avenue N.W.
- North on 20 Street N.W.
- East on 4 Avenue N.W.
- North on 19 Street N.W., to regular route
Detour
Affected routes: Route 13
Affected stops: stop 4687, stop 5588, stop 5603
Active Aug 22, 2026, 4:00 AM MT until Sep 30, 2026, 11:59 PM MT.
Starting Saturday, August 22 at 4 a.m. until further notice, 50 Avenue between 17 - 20 Street S.W. will be closed for construction. Route 13 will be detoured.
Inbound route 13 will travel:
- From East on 50 Avenue S.W.
- North on 20 Street S.W.
- East on 49 Avenue S.W.
- South on 17 Street S.W.
- East on 50 Avenue S.W., to regular route
Outbound route 13 will travel:
- From West on 50 Avenue S.W.
- North on 17 Street S.W.
- West on 49 Avenue S.W.
- South on 20 Street S.W.
- West on 50 Avenue S.W., to regular route
The following stops will be temporarily closed:
- EB 50 AV SW @ 20 ST SW #5603
- EB 50 AV SW @ 19 ST SW #4687
- WB 50 AV SW @ 19 ST SW #5588
Please use the following stops in lieu of the closed stops:
- NB 20 ST SW@ 50 AV SW #5353 - detour stop
- WB 50 AV SW @ 20 ST SW #5347
Stop moved
Affected routes: Route 115, Route 158
Affected stops: stop 9573
Active Sep 8, 2026, 6:00 AM MT until Sep 15, 2026, 3:00 PM MT.
Starting Tuesday, September 8 through Tuesday, September 15, from 9 a.m. to 3 p.m. daily, the northbound right lane on Rocky Ridge Road N.W. between Royal Oak Gardens N.W. and Royal Oak Way N.W. will be closed for utility work. Routes 115 and 158 will have a stop closure.
The following stop will be temporarily closed:
- NB Rocky Ridge RD @ Royal Oak WY NE (#9573) - Routes 115 and 158
Please use the following stop in lieu of the closed stop:
- NB Rocky Ridge RD N.W. @ Royal Oak WY N.W. - temporary stop, 180 m south of the closed stop
Detour
Affected routes: Route 1
Affected stops: stop 7876
Active Sep 10, 2026, 6:00 AM MT until Oct 2, 2026, 3:00 PM MT.
Starting Thursday, September 10 through Friday, October 2, from 9 a.m. to 3 p.m. daily, the northbound lane on Bowness Road N.W. between 44 Street and 45 Street N.W. will be closed for construction. Route 1 will be detoured.
Route 1 will travel:
- From North on Bowness Road N.W.
- West on 44 Street N.W.
- North on 17 Avenue N.W.
- East on 45 Street N.W.
- North on Bowness Road N.W., to regular route
The following stop will be temporarily closed:
- NB Bowness RD @ 45 ST N.W. (#7876)
Please use the following stop in lieu of the closed stop:
- EB 45 ST N.W. @ Bowness RD N.W. - nearside detour stop
Detour
Affected routes: Route 8, Route 90
Affected stops: stop 3560
Active Sep 10, 2026, 6:00 AM MT until Sep 14, 2026, 8:00 PM MT.
Starting at 8 p.m. on Thursday, September 10, and continuing until 8 p.m. on Monday, September 14, Hospital Road N.W. will be closed at Heritage Medical Research Building. Route 8 & southbound Route 90 will be detoured.
Buses will travel:
- From west on 16 Avenue N.W.
- Exit ramp to University Boulevard N.W., to Hospital Drive N.W.
- East on 16 Avenue N.W.
- South on 29 Street N.W.
- West into south leg of Foothills Medical Centre
- Continue north, past Grace Women's Health Centre
- East on Hospital Boulevard N.W., to regular route
The following stop will be temporarily closed:
- EB Hospital DR @ Cal Wenzel PH Bldg NW (#3560)
Please use the following stop in lieu of the closed stop:
- EB Hospital DR @ Health Science CE NW (#2933)
Detour
Affected routes: Route 6
Affected stops: stop 8765, stop 8769
Active Aug 30, 2026, 7:00 AM MT until Sep 22, 2026, 7:00 PM MT.
Starting Sunday, August 30 at 7 a.m. through Tuesday, September 22 at 7 p.m., 26 Avenue S.W. will be closed from 16 - 17A Street S.W. for construction. Route 6 will be detoured.
Inbound buses will travel:
- East on 26 Avenue S.W.
- North on 18 Street S.W.
- East on 25 Avenue S.W.
- North on 17A Street S.W., to regular route
Outbound buses will travel:
- South on 17A Street S.W.
- West on 25 Avenue S.W.
- South on 18 Street S.W.
- West on 26 Avenue S.W. to regular route
The following stops will be temporarily closed:
- NB 17A ST SW @ 26 AV SW (#8765)
- WB 26 AV SW @ 17A ST SW (#8769)
Please use the following temporary stops in lieu of the closed stops:
- NB 17A ST SW @ 25 AV SW (far side)
- WB 26 AV SW @ 18 ST SW (far side)
Detour
Affected routes: Route 43
Affected stops: stop 7565
Active Sep 10, 2026, 6:00 PM MT until Sep 11, 2026, 5:00 AM MT.
Starting at 9 p.m. on Thursday, September 10, and continuing until 5 a.m. on Friday, September 11, northbound 36 Street N.E. will be closed from 26 - 32 Avenue N.E. Route 43 will be detoured.
Buses will travel:
- North on 36 Street N.E.
- East on 26 Avenue N.E.
- North on Rundleson Road N.E.
- North on Rundlelawn Road N.E.
- West on 32 Avenue N.E.
- North on 36 Street N.E., to regular route
The following stop will be temporarily closed:
- NB 36 ST NE @ 26 AV NE (#7565)
Please use the following stops in lieu of the closed stop:
- EB 26 AV NE @ 36 ST NE (#7394)
- NB 36 ST NE @ 32 AV NE (#7579)
Detour
Affected routes: Route MO
Active Sep 10, 2026, 6:00 PM MT until Sep 11, 2026, 5:00 AM MT.
Starting at 9 p.m. on Thursday, September 10, and continuing until 5 a.m. on Friday, September 11, northbound 36 Street N.E. will be closed from 26 - 32 Avenue N.E. MAX Orange will be detoured.
Buses will travel:
- North on 36 Street N.E.
- East on 26 Avenue N.E.
- North on Rundleson Road N.E.
- North on Rundlelawn Road N.E.
- East on 32 Avenue N.E., to regular route
There will be no missed MAX Orange stops as a result of this closure.